Been concentrating on getting all jobs complete at rear of boat prior to installing seat tops. IE Rear insulated beer cooler/wet locker, front floor drainage. Also covered seats in cloth for some abrasion resistance. Hopefully seats on within the week.
Chilly bin/wetlocker glassed with 400gm double bias
Forward drain from forward floorboards. Made a foam blank and made custom widemouth drain out of glass.
Drain pipe through to footwell
Drainoutlet in footwell
Seats covered in two layers of 200gm boat cloth and peel ply
No comments:
Post a Comment